The company specializing in the production of various automotive wiring harness, motorcycle wiring harness, electronic wire, machine harness, game machine wire harness, refrigerator wiring harness, speaker cable, HDMI cable, household wiring harness, printer, copier wire harness, FFC/RFC flat line, medical appliance wiring harness;
Our company and Molex, Amp, Yazaki, and other well-known connector factory has a long-term good cooperation, ensure delivery; can be customized drawings for product development, meet environmental requirements; delivery time: 10-15 days;
1.Wire GB QVR, Japanese standard AVSS German standard FLYYF, American Standard GPT automotive standards with line
2.Connector AMP, YAZAKI, SUMITOMO, KET, MOLEX, KUN, DELPHI, FCI and other brands
3.Production standards in accordance with national QC/T29106 (automotive technical conditions) with a low-voltage wiring harness requirements
4.Reliable connection, all products strictly in accordance with ISO and TS16949 quality system for design, production and 100% factory inspection
5.Products according to the customer s design requirements, to provide customer satisfaction
6.Can do small quantities; specialize in high-tech industrial wiring harnesses and automotive wiring harness; Test Equipment (salt spray test equipment, temperature and humidity equipment, magnifying glass, swing test equipment, the waterproof test equipment)
Inspection:
Item
|
Equipment
|
Condition & Method
|
Requirement
|
Appearance
|
Camera,
Video Recorder, Magnification
Apparatus (as required)
|
Visual
examination
Vision:>1.0,at
Normal
strength of vision and color
perception .
Illumination:
(200~300)K
Viewing
distance: (0.3~0.5) m
|
1.piastic
part: smooth and fiat surface
without discolor, broken,
cark, distortion defects is
acceptable.
2.Metal
part: bright and even surface
without rust, oxide, fog and
obvious physical damage defects
is acceptable.
3.Wire:Clearing
surface without discolor ,
broken defects is acceptable.
4.
The contact crimp, identification,
other component shall be checked
against the relevant specification.
|
Dimension
|
Calipers,
ruler, tape measure
|
Use
caliper, ruler or tape
measure to measure the
dimension
|
The
dimension accord with
the part drawing
|
Insulation
resistance
|
Megohmeter
or insulation resistance
tester
|
Apply
requirement voltage (desiccation
bound:500V DC: damp bound:100V
DC) between all contacts connected
together and a metal foil
surrounding the housing. In
addition, apply the voltage
a different test sample to
every two adjacent contacts
|
Insulation
resistance:
≥500
MΩmin;
|
Withstand
voltage
|
Withstand
voltage tester
|
Apply
an ac voltage of 500V
(50Hz) f or 1min across
all contacts connected
together and a metal foil
surrounding the housing
. In addition, apply the
voltage a different test
sample to every two adjacent
contacts.
|
During
this test, neither dielectric
breakdown nor flash-over
shall occur.
|
Pull
out force
|
Force
tester
|
Mount
the contact in a fixture.
Apply an axial force at
axial between 25 and 100mm/min.For
double, triple or multiple
crimp setups with conductor
sizes within one step,
pull the largest conductor
|
导线AVSS1.0
|
120
N MIN
|
导线AVSS0.75
|
90
N
MIN
|
Contact
retention in housing
|
Force
tester
|
Apply
axial pull out force at
the speed rate of 50mm/minute
on the contact assembled
in housing.
|
镀镍端子压在电子线上
|
50
N MIN
|
High
temperature testing
|
Temperature
chamber capable of maintaining
the specified temperature
conditions
|
Place
the test sample in a test
chamber and leave them
there at the temperature105℃±2℃for
8 h. The sample shall
be allowed to cool in
air for 24 h.
|
After
test, meet the item 4.1,
4.4, 4.5 requirements.
|
Low
temperature testing
|
Temperature
chamber capable of maintaining
the specified temperature
conditions
|
Place
the test sample in a test
chamber and leave them
there at the temperature-40℃±2℃for
8 h. The sample shall
be allowed to cool in
air for 24 h.
|
After
test, meet the item 4.1
requirement.
|
Humidity
heat, Constant
|
Temperature-Humidity
chamber
capable of maintaining the
specified condition on a continuous
basis
|
Place
the test samples in the
chamber(shall not match
the contact pair ).Raise
the temperature to the
(40±2)℃,During the temperature
transition ,the humidity
to(90±3)% within 1 h.
Hold the test samples
to(40±2)℃at(90±3)% RH
for 96h. The sample shall
be allowed to cool in
air for 1h.
|
After
test, meet the item 4.1,4.4,4.5
Requirements.
|
Salt
spray
|
Salt
spray chamber
|
The
salt solution concentration
shall be 5% solution shall
be prepared by dissolving
5±1 part by weight of
salt in 95 parts by weight
of distilled or other
water. Apply it to mated
connectors fitted with
the full complement of
contacts and cables connected.
The duration of the test
shall be 24h. The PH shall
be maintained between
6.5 and 7.2. The test
shall be conducted with
a temperature in the exposure
zone that is maintained
at(35±2)℃. Salt deposits
shall be removed by a
gentle wash or a dip in
running water and a light
brushing. The sample shall
resume at room temperature
for 1~2h.
|
Visual
examination
The
following appearance appearance
shall not be allowed:
Exposure
of base metals, pitting and
porosity of finishes. Cracking
and delaminating of components
or finishes, or both
|
|